How to install Solar Studs Light Pavement Marker C3:
1.Carefully mark the distance between the placement of solar road stud lights. To prevent an adverse effect on the ground, use a proper tool such as Core Drill. Drill 125mm and depth will be 45mm.
2.Remove all debris from the installation hole.
3.Pour epoxy into the holes per the manufacturer’s instruction.
4.Verity that the installation hole is straight. Verify that the installation hole is large enough to allow the epoxy to surround the solar road stud shaft.
5.Set the lighting surface of the solar stud light to the desired viewing angle. Verify the epoxy is evenly adhering to the installation hole and solar road stud shaft.
After curing the LED solar road stud for 6-8 hours, remove the installation of the isolation facility.